Service 05

Interior Design

Concept through installation, including the unglamorous half: schedules, lead times, purchase orders and the freight that has to land in the right week.

What you get

A specified, sourced, installable interior.

Interior design for hospitality is an operations problem wearing a beautiful dress. A scheme is only as good as its ability to survive housekeeping, a hundred check-ins a week and a replacement order placed four years from now.

We design the guest experience as a sequence, from approach and arrival through the room and back out to the amenity floors, and we specify to that sequence. Every material is chosen with its maintenance, cleaning regime, fire rating and reorder availability already checked.

The output is a full FF&E package: finish schedules, furniture specifications with dimensions and fabrics, lighting selections, art and accessory direction, and a procurement schedule with realistic lead times. We can hand that to an owner's purchasing agent or run it ourselves through to install and styling.

Deliverables

Exactly what leaves the studio.

Scope is agreed line by line before work starts, so there is never a question about what was included.

Concept and direction
Narrative, palette, material language, guest journey
FF&E specification
Furniture, fixtures and equipment with full technical schedules
Finish schedules
Every surface, with maintenance, rating and reorder availability
Lighting design
Layered scheme, fixture selection, scene setting and controls
Custom furniture
Designed pieces drawn and detailed for fabrication
Procurement and install
Lead times, purchase orders, freight, delivery and styling

Sequence

How the work runs.

Four stages, each with something reviewable at the end of it.

  1. 01

    Concept

    The idea, the palette and the guest sequence

  2. 02

    Specify

    Every item scheduled with technical and maintenance data

  3. 03

    Procure

    Orders placed against a realistic, tracked lead time schedule

  4. 04

    Install

    Delivery, placement, styling and a handover an operator can run